9901526 – Axle Spindle Weld Failure – 2020-2021 Jayco Northpoint Fifth Wheel Recreational Trailers

October 29, 2020 NHTSA CAMPAIGN NUMBER: 20V665000

Axle Spindle Weld Failure

If the wheel/spindle assembly separates from the axle tube, it can increase the risk of a crash.

 

NHTSA Campaign Number: 20V665

Manufacturer JaycoeBay logo, Inc.

Components SUSPENSION

 

Summary

JaycoeBay logo, Inc. (JaycoeBay logo) is recalling certain 2020-2021 Fifth Wheel Northpoint 387RDFS(LZ) recreational trailers. The welds on the axle spindle may fail, causing the wheel/spindle assembly to break away from the axle tube.

 

Remedy

JaycoeBay logo will notify owners, and dealers will inspect the axle, and replace if necessary, free of charge. The recall began December 30, 2020. Owners may contact JaycoeBay logo customer service at 1-617-776-0344. JaycoeBay logo’s number for this recall is 9901526.

 

Notes

Owners may also contact the National Highway Traffic Safety Administration Vehicle Safety Hotline at 1-888-327-4236 (TTY 1-800-424-9153), or go to www.safercar.gov.

 


DextereBay logo D70 3500K Axle – Spindle Weld Discrepancy

Bulletin Type:Safety RecallPublication Date:  December 30, 2020
Bulletin #(s): 20V-665 US Units

2020-649 CN Units

Make(s): JaycoeBay logo
Job Code: 9901526Model(s): Northpoint

 

Flat Rate: Inspect Axle .3 Hr. per Axle

Replace Axle 2 Hr. per Axle

Model Year: 2020 & 2021

 

Submit ONE claim per fifth wheel. Do not submit for inspection ONLY when axle/s must be replaced.   Please note the defective axle serial #/s on claim. Thank you 

Incident: Weld between the Axles Spindle and Axle Beam may be off-center causing improper penetrations resulting in weld fatigue and failure.
Affected Units: 2020  Northpoint

L1LA0069-0110  LB0052-0141  LD0064-0073  LE0107-01256  LF0069  LL0190,0278-0355  LR0099-0112  LY0117-0132  LZ0086-0097

 

2021  Northpoint

M1LA0051-0098, 90003  LB0051-0140  LF0051-0146  LG0052-0099  LL00500260  LZ0051-0062

 

Parts Kit: Parts Kit # 20V-665
Parts Kit Contents: DextereBay logo Axle and hardware
Parts Return: Do not return axles. Cut in half and discard. Sign and return acknowledgment form to Complinace@jaycoeBay logo.com.

 

INSPECTION to confirm Serial Number of each axle

 

  1. Check the axle label located on the rear side of the axle beam (Fig. A) in the center of the axle as shown below.

 

  1. Axle Serial Numbers are located on the axle label as shown in the example below. See the area circled.

 

Replace all axles that have the following serial numbers:

-132180140
-132180775
-132219804
-132214556

 

Axle serial number location

 

INSTRUCTIONS

Setup

Fig 1:

 

Fig 2:

  • Position the unit on a flat level surface in a level condition.
  • Support the unit at the pin box with a suitable pin box stand or a forklift.
  • Make sure to set the wheel stops on the pin box stand so it does not roll.
  • Retract ALL stabilizer jacks.

 

 FIG 3: 

 

Disconnect the Brakes

FIG 5:

  • Cut the brake wire connections to both axles.
  • Remove the rubber protective caps on the wire connections.

 

FIG 6:

  • Use the wire cutters and cut off only the copper crimps on both sets of wires at each axle.
  • Wiring remains under the trailer to reuse on the new

 

Remove Old Axles

FIG 7:

  • Starting with the front axle, place a floor jack  under that axle to support it, so once it is free it will not fall to the ground.

 

FIG 8:

  • Remove the nut from the spring hanger bracket. DO NOT REMOVE THE BOLT YET.
  • Use the 13/16 wrench and the 11/16 impact socket and impact driver.
  • NOTE: the bolt shown is a Standard Bolt (Seismic) if there is a grease zerk on the bolt head (not shown) it is a Wet Bolt (Pinnacle). Inspect Shackle links for wear. If they are worn, replace.

 

FIG 9:

  • Remove the nut from the bolt holding the spring to the equalizer shackle link.

Go around to the other side of the trailer and remove the spring hanger nut and equalizer link nut.

 

FIG 10:

  • Make sure the floor jack is under the axle to support it, and drive the bolts out of the equalizer shackle links and the spring hanger brackets from the nut end.
  • Drive the 4 bolts out of the shackles from the nut end with a small, sledge hammer.
  • NOTE: if new shackle links are included in the kit, all shackle links should be replaced with new ones.
  • Old hardware will not be re-used, discard bolts. Use new hardware from the kit. The axle should now be loose, roll it out from under the trailer on the floor jack.

 

Install New Axles

Roll the new axle with springs attached, under the trailer on the floor jack and raise into position.

Position the axle so it bends upward under the trailer, the middle of the axle should be higher than the ends (See Fig 1 below).

Silver axle ID tag (A) should be located on the backside of the axle tube facing the rear of the trailer.

Black wires from the axle hub should end up on the same side of the trailer as the blue & white wires cut in Figs 5 & 6.

 

FIG 11:

  • Springs on the new axle should be installed using the new hardware from the kit (shackle links, bolts & nuts) Seismic contains standard bolts, while Pinnacle Kit has a wet bolt (Gig 11)
  • NOTE: in order to drive a wet bolt (grease zerks) into shackles and spring hanger bracket without damaging the grease fitting place something like a 9/16 socket over the bolt head so you can drive the bolt into the link or bracket with the hammer (instead of the bolt head).
  • NOTE: The grease zerk should face outward (nearest the tires) and the grease exit hole should be oriented to either 3 o’clock or 9 o’clock position to allow optimism grease flow.

 

FIG 12:               

  • Drive the bolts into the spring bushings and hanger brackets on both sides of the trailer.
  • (Reference the notes in Fig 11)
  • Bolt head MUST be flush with the spring hanger bracket.
  • DO NOT TRY TO DRAW IT FLUSH USING THE IMPACT DRIVER FROM THE NUT SIDE.
  • DO NOT TIGHTEN THE NUTS WITH THE IMPACT DRIVER. USE A RATCHET AND SOCKET. USE THE TORQUE WRENCH WITH 11/16 SOCKET AND TORQUE NUTS TO 45 FT/LBS.

Use 13/16 wrench on the bolt heads.

 

FIG 13:

  • Drive bolts through new shackle links and spring bushing at the equalizer on both sides of the trailer. (Reference notes in Fig 11)
  • Bolt head MUST be flush with the shackle link.
  • DO NOT TRY TO DRAW IT FLUSH WITH THE IMPACT DRIVER FROM THE NUT SIDE.                                    DO NOT TIGHTEN NUTS WITH THE IMPACT DRIVER. USE A RATCHET AND SOCKET. USE THE     TORQUE WRENCH WITH 11/16 SOCKET AND TORQUE NUTS TO 45 FT/LBS.

 

FIG 14:

  • When installing nuts on the wet bolts (Fig 12 & 13):

Make sure at least 2 to 3 threads show beyond the face of the nut.

 

Repeat Steps 5 through 13 to remove and replace the rear axle. Use the floor jack under the axle to Support the axle during removal and installation.

After replacement of both axles, reconnect the brake wiring.

Brake wires should be on the same side of the trailer for both axles. Insure wire connectors are a weatherproof type as shown in Figure 5.

Apply electric to the unit and Check the brakes to insure they are working properly.

 

Brake Wiring Connection

 

FIG 14:

  • On the front axle:
  • Strip the ends of all the brake wires approximately ½” as shown in the photo. 2 blue wires, 2 white wires, and 2 black wires.

 

FIG 15:

  • Harness brake wires should be approximately 3 inches long

 

FIG 16:

  • On the front axle:
  • Twist the 2 blue wires and 1 black wire together and crimp with a copper sleeve. Then cover the connection with a rubber boot.
  • Twist the 2 white wires and remaining black wire together and crimp with a copper sleeve. Then cover the connection with a rubber boot.

 

FIG 17:

  • Completed connections for the brake wiring on the front axle.
  • Dress wires along the backside of the axle and away from pinch hazards like the springs or the frame (See Fig 18).

 

NOTE: At the rear axle, there will only be 1 blue, 1 white and 2 black wires.

 

Strip the blue, white and 2 black wires approximately ½”.

 

Twist the blue with one of the black wires (does not matter which one) and crimp with a copper sleeve. Twist  the white with the remaining black wire and crimp with a copper sleeve.

 

Then cover each connection with a rubber boot.

 

FIG 18:

  • Secure wires to axle with weather resistant wire ties (circled in photo).
  • Leave enough slack so the wires can move with the axle and will not get tangled in pinch points, like the frame or the springs.

 

FIG 19:  

  • Re-install the wheels and lug nuts.
  • Lower the trailer back on to the ground.
  • Torque all the lug nuts to 65 ft. lbs., then final torque them to 120 ft/lbs.

 

JaycoeBay logo’s sole obligation under our limited warranty is to repair or replace defective materials and/or workmanship deemed our responsibility as determined by JaycoeBay logo in our sole discretion. JaycoeBay logo reserves the right to use new and/or remanufactured parts or materials of similar quality to complete any work, and to make parts and/or design changes as appropriate without notice to anyone. JaycoeBay logo designs and/or materials changes are done without obligation to incorporate such changes in previously manufactured product. JaycoeBay logo makes every reasonable effort to ensure field remedies will not adversely affect performance and/or safety of the unit. This field remedy is not intended to extend to future performance of this RV, or any of its materials, components or parts beyond the standard warranty period. The RV owner’s obligation to notify JaycoeBay logo, or one of its independent, authorized dealers, of a claimed defect does not modify any obligation placed on the RV owner to contact JaycoeBay logo directly when attempting to pursue remedies under state or federal law.  Jan. 2019.

 

903 South Main Street  •  P.O. Box 460  •  Middlebury, IN 46540

 



2 Affected Products

Vehicle

MAKEMODELYEAR
JAYCOeBay logoNORTHPOINT2020-2021

 


11 Associated Documents

Recall 573 Report – Amendment 1

RCLRPT-20V665-9811.PDF 213.51KB

 


Remedy Instructions and TSB

RCRIT-20V665-5328.pdf 1316.653KB

 


Recall 573 Report – Amendment 2

RCLRPT-20V665-7415.PDF 213.505KB

 


Recall Acknowledgement

RCAK-20V665-3531.pdf 274.928KB

 


Defect Notice 573 Report

RCLRPT-20V665-2363.PDF 213.496KB

 


Manufacturer Notices(to Dealers,etc)

RCMN-20V665-2309.pdf 141.864KB

 


ISSUED Owner Notification Letter(Part 577)

RCONL-20V665-7858.pdf 56.013KB

 


Recall Quarterly Report #1, 2020-4

RCLQRT-20V665-2038.PDF 211.116KB

 


Recall Quarterly Report #3, 2021-2

RCLQRT-20V665-8405.PDF 211.302KB

 


Recall Quarterly Report #2, 2021-1

RCLQRT-20V665-9049.PDF 211.221KB

 


Recall Quarterly Report #4, 2021-3

RCLQRT-20V665-6241.PDF 211.401KB

 


Latest Recalls Documents

 


 

Bestseller No. 1
RigsNParts Trailer Idler Hub Kits with 5 on 4.5" Bolt Idler Hub & Round #84 Trailer Axle Spindle Fit for 3500 lb,2 Sets
  • RigsNParts 2 X Trailer Idler Hub Kits 5 on 4.5" for 3500 lbs Trailer Axle Fits 1-1/16'' with 2 X #84 Trailer Axle Spindles
  • RigsNParts #84 Spindle with a 1.75" Diameter at Biggest end, Overall length: 8.25", Application: 3500 lbs Trailer Axles, Spindle Capacity: 1750 lbs Per Wheel
  • RigsNParts The Package Contains 2 pcs 3500 lbs Trailer Axle Spindle, 2 pcs Cotter Pin, 2 pcs Spindle Nut, 2 Spindle Washers,2 pcs 5 on 4.5" Trailer Hub, 2 pcs L68149 Inner Cone Bearings, 2 pcs L44649 Outer Cone Bearings, 2 pcs 1.719” I.D X 2.565” O.D Grease Seal,2 pcs E Z Lube Grease Cap with Rubber Plugs, 10 pcs Cone Wheel Nuts 1/2”-20 Thread
  • RigsNParts Trailer Idler Hub Kits Using Alloy Steel Materials, It Has Superior Corrosion Resistance and Durability.Trailer Hub Packaged in Bubble Boxes, Which can Effectively Avoid Zero Level Collision and Wear During Transportation
  • RigsNParts If You Purchase Trailer Hub Spindle Kit That does Not Meet Your Requirements, Please Contact Us in a Timely Manner
SaleBestseller No. 2
Trailer Spindle for 3,500 lb #84 Axle Weld On 1 3/4 inch Round with Brake Flange
  • 3500-pound steel #84 axle spindle
  • Weld-on butt end measures 1 3/4 inch diameter x 2 5/8 inch Length
  • 1 1/16" (44649 bearing) x 1 3/8" (68149 bearing) combination
  • 1.72" Inner Diameter seal surface
  • Accu Lube greaseable zerk fitting
Bestseller No. 3
dreamdragon 2pcs 2000lbs Trailer Axle Trailer Hub Kit 5 Bolt 4.5" with BT8 Trailer Axle Spindle
  • 5-4.5" Trailer Circle Hub Kit Includes BT8 1" spindle
  • Round 84 Spindle, Spindle width =1 1/2" Spindle length=4" Overall length =8 7/8" Capacity (pair) 2,000 lbs
  • Spindle includes spindle nut, spindle washer, and cotter pin
  • Accessories includes L68149 inner and L44649 outer bearing, seal, grease cap, and lug nuts
  • After-sales service: If you encounter any problems in the process of use, you can contact us at any time
Bestseller No. 4
FKG Trailer Hub Spindle Kit 5 Bolt on 4.5' Bolt Circle Fit for 3,500 lb. axles with 1-3/8 Inch to 1-1/16 Inch Tapered Spindles, Set of 2
7 Reviews
FKG Trailer Hub Spindle Kit 5 Bolt on 4.5" Bolt Circle Fit for 3,500 lb. axles with 1-3/8 Inch to 1-1/16 Inch Tapered Spindles, Set of 2
  • Outer Races are installed in 5 Bolt on 4.5" Bolt Circle Hub
  • Fits 3,500 lb. axles with 1-3/8 Inch to 1-1/16 Inch Tapered Spindles
  • OE quality: ISO/TS 16949 certified, tested to the strictest OE standards, also improved those traditional design weaknesses, to ensure vehicle fitment and product reliability
Bestseller No. 5
VIRTIONZ Trailer Idler Hub Kit 2000 lbs with 4 on 4" Trailer Hub & 1" Round BT8 Spindle Two hubs,Trailer Axle Kits 4 Lug Include L44643 Bearings Kit,2 Sets
  • Trailer Axle Kits with 4 on 4" Bolt Idler Hub & 1"
  • 1,250 lb Hub Capacity, Used On 2,000 lb Axle Shaft 1 Diameter: 1 1/4" Shaft 2 Diameter: 1" Shaft Length: 8 3/4" (4" Long Stub) Hub A Diameter.: 2 1/2" Hub B Diameter: 5 1/2" Bolt Pattern: 4"
  • 2) Idler Hub with Lug Nuts, (2) 1" BT8 Round Spindle with Castle Nut, Pin & Washer, (4) Inner/Outer Bearings, (2) Double-lip Grease Seal (1 1/4" I.D. / 2" O.D.), (2) 2" Grease/Dust Cap
  • Assembly with 4 on 4" bolt idler hub & 1" round BT8 spindle. Rated to 1,250 lbs. each or 2,000 lbs. for the pair

This product presentation was made with AAWP plugin.

Leave a Comment

Share to...